Generally, after 5 years of using your squash court, a renovation of the floor will become necessary. Usually, this is quite simple: Sand off the floor and then treat it with the ASB Floor renovation set. A detailed instruction manual will help you.
After sanding off the floor, use our all-inclusive package which includes paint roller, roller extension, square bucket with protection foil, paint grid, brush, floor marking paint (red, blue, yellow, green or white), protection shoes, masking tape (50 mm wide) and 10 litres of floor impregnation (Sportive Finish) nature for anti-slip surfaces.
After application of the ASB floor impregnation, your floor is back to non-slip and looks completely new. No traces of shoes or rackets are left.
Additional Information
Time | 14 hours of work for one worker / 24 hours to completion |
Difficulty | Difficult - expertise and craftsmanship needed |
Tools | Floor sander, 60-grit sanding paper, broom or vacuum cleaner |
Quantity | Sufficient for one squash court |
Category | Renovation |
Tip | After five years, when the slip resistance wears off, we recommend a renovation of the floor. |
Suitable for | ASB SystemCourt, plastered Court, Panel Court |